Material variance
Also: variance · allowance variance
Material variance is the difference between the material allowance an estimate budgets and what the materials actually cost at a supplier. A positive variance erodes job margin; catching it during buyout — while specification and supplier are still negotiable — is the difference between absorbing an overrun and supplementing it.
Related terms
← Back to the full glossary